Do the daily maintenance of Daswell beton mixer well

1. Preparation before installation. The preparation before installation is to examination whether the accessories of compulsory concrete mixer is matched or in good condition. The first is to examine the sign of motor and then the insulation resistance. Users should examine whether the motor is damaged or out of shape. The installation of motor should ensure the installation surface smooth and the cable connected with power reliable and stable. The motor must be connected with ground wire. The empty operation of SICOMA concrete mixer accessories should be done after installation and the exciting force must be adjusted.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:concrete mixer for sale,diesel engine concrete mixer,mobile concrete mixing batch plant,We will provide you with the best product and service.

2. Examine the foundation bolt in the early using of compulsory concrete mixer. After a period of time, examine whether bearing and other vulnerable parts is damaged or not. If it is damaged self loading mobile concrete mixer, change it in time. Check and adjust again when the concrete mixer is saved for a long time and is used again.

3. Examine whether every part is damaged, the bolt is fixed, there is strange noise and working state is normal after using the concrete mixer. After using beton mixer, the concrete mixer should be cleaned.

VN:F [1.9.15_1155]
Rating: 0.0/10 (0 votes cast)
VN:F [1.9.15_1155]
Rating: 0 (from 0 votes)

Leave a Reply

Get Adobe Flash playerPlugin by wpburn.com wordpress themes