How to eliminate the blocking of Daswell concrete pump

2. The slow interval cycle delivery of stationary concrete pump is done by using materials in the concrete pump truck or the interval anti-pumping and pumping is done by using materials in the hopper

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:Sicoma Planetary Concrete Mixer,concrete pumps,Twin Shaft Concrete Mixer,We will provide you with the best product and service.

1. Slow interval cycle delivery is done when pumping again after cleaning the concrete pump truck, delivering the concrete into hopper by cantilever crane or pipe.

The followings are measures to eliminate interruption which is not caused by the blocking.

3. If the above methods are invalid, remove the blocking part of the delivery pipe after discharging to eliminate the blockage and then connect the delivery pipe. Before pumping again concrete mixing batch plant for sale, eliminate air in the delivery pipe and tighten the connector.

2. Find out the place where is blocked by mallet. Knock the concrete until it becomes loose and then repeat pumping and anti-pumping to eliminate blocking.

VN:F [1.9.15_1155]
Rating: 0.0/10 (0 votes cast)
VN:F [1.9.15_1155]
Rating: 0 (from 0 votes)

Leave a Reply

Get Adobe Flash playerPlugin by wpburn.com wordpress themes