What cause the interruption of Daswell concrete pump

3. If the above methods are invalid, remove the blocking part of the delivery pipe after discharging to eliminate the blockage and then connect the delivery pipe. Before pumping again portable concrete mixer, eliminate air in the delivery pipe and tighten the connector.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:concrete block making machine,belt type concrete batching plant,portable concrete mixer,We will provide you with the best product and service.

The followings are measures to eliminate interruption which is not caused by the blocking.

1. Slow interval cycle delivery is done when pumping again after cleaning the concrete pump truck, delivering the concrete into hopper by cantilever crane or pipe.

2. The slow interval cycle delivery of stationary concrete pump is done by using materials in the concrete pump truck or the interval anti-pumping and pumping is done by using materials in the hopper

3. There are four strokes of pumping and anti-pumping every four to five minutes in the slow interval delivery.

VN:F [1.9.15_1155]
Rating: 0.0/10 (0 votes cast)
VN:F [1.9.15_1155]
Rating: 0 (from 0 votes)

Leave a Reply

Get Adobe Flash playerPlugin by wpburn.com wordpress themes