What is the pouring Sequence of Daswell Concrete Pump

1. The pouring should be from far to near when users deliver concrete with pipeline.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:Sicoma Twin Shaft Concrete Mixer,concrete mixing and batching plant,ready-mixed concrete batching plant,We will provide you with the best product and service.

2. When delivering concrete in same area, the concrete pump adopts the layered continuous pouring batching plant, which is from vertical structure to horizontal structure.

3. When it is not allowed to have construction joints, concreting intermission time between regions and the upper and lower levels should not exceed the initial setting time of concrete.

4. After the initial setting time of the lower level concrete, users should deal with according to the regulation of construction joints when they pour the upper level concrete.

5. It is necessary to divide well the concrete pouring regions in advance according to features of engineering structure, plane shape, geometry size, ability of concrete supply and pumping equipment concrete batching plant, labor force, management ability and size of surrounding area.